{"id":2648,"date":"2026-10-19T13:12:09","date_gmt":"2026-10-19T13:12:09","guid":{"rendered":"https:\/\/www.epw.com\/blog\/?p=2648"},"modified":"2026-10-19T13:12:10","modified_gmt":"2026-10-19T13:12:10","slug":"coordinate-vendors-project-life-cycle","status":"publish","type":"post","link":"https:\/\/www.epw.com\/blog\/project-management-articles\/coordinate-vendors-project-life-cycle","title":{"rendered":"How to Coordinate Vendors Across the Project Life Cycle"},"content":{"rendered":"<p><!-- EPW PRODUCTION BRIEF\nPrimary topic: Vendor coordination across the project life cycle\nPrimary query: how to coordinate vendors across the project life cycle\nSearch intent: Informational\nPrimary article type: How-To\nAudience: Project managers, procurement leads, contract managers and workstream owners coordinating external vendors\nDesired action: Apply a practical coordination method and explore relevant EPW training\nExisting EPW content: The complete WordPress Posts list was searched across Published and Draft statuses for the exact title, close variants, slug, primary keyword and substantially equivalent intent; no competing how-to article was found\nSearch-result gap: Existing EPW content does not provide an end-to-end, project-specific vendor coordination method linking contracts, schedule interfaces, evidence and escalation\nOriginal EPW value: The EPW ALIGN vendor coordination model, a control table, worked example and completion checklist\nPrimary CTA: https:\/\/www.epw.com\/training\/project-procurement-and-vendor-coordination\nCategory: Project Management Articles\nTags: Contract Management; Supplier Management; project management\nSchema: BlogPosting\n--><\/p>\n<p><strong>To coordinate vendors across the project life cycle, establish one accountable owner, translate every contract into measurable deliverables and decision dates, integrate vendor dependencies into the project schedule, agree a shared reporting cadence, and control risks, changes, acceptance and closeout through recorded evidence.<\/strong> The method must be proportionate: a critical systems integrator needs more governance than a low-risk commodity provider.<\/p>\n<p>Vendor coordination sits where project management, procurement and contract management meet. It does not replace the contract or the supplier\u2019s own management system. It creates the practical interfaces through which the buyer, project team and vendors can deliver the agreed outcome without conflicting instructions, hidden dependencies or late surprises.<\/p>\n<div id=\"ez-toc-container\" class=\"ez-toc-v2_0_82_2 counter-hierarchy ez-toc-counter ez-toc-custom ez-toc-container-direction\">\n<div class=\"ez-toc-title-container\">\n<p class=\"ez-toc-title\" style=\"cursor:inherit\">Table of Contents<\/p>\n<span class=\"ez-toc-title-toggle\"><a href=\"#\" class=\"ez-toc-pull-right ez-toc-btn ez-toc-btn-xs ez-toc-btn-default ez-toc-toggle\" aria-label=\"Toggle Table of Content\"><span class=\"ez-toc-js-icon-con\"><span class=\"\"><span class=\"eztoc-hide\" style=\"display:none;\">Toggle<\/span><span class=\"ez-toc-icon-toggle-span\"><svg style=\"fill: #dd0808;color:#dd0808\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\" class=\"list-377408\" width=\"20px\" height=\"20px\" viewBox=\"0 0 24 24\" fill=\"none\"><path d=\"M6 6H4v2h2V6zm14 0H8v2h12V6zM4 11h2v2H4v-2zm16 0H8v2h12v-2zM4 16h2v2H4v-2zm16 0H8v2h12v-2z\" fill=\"currentColor\"><\/path><\/svg><svg style=\"fill: #dd0808;color:#dd0808\" class=\"arrow-unsorted-368013\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\" width=\"10px\" height=\"10px\" viewBox=\"0 0 24 24\" version=\"1.2\" baseProfile=\"tiny\"><path d=\"M18.2 9.3l-6.2-6.3-6.2 6.3c-.2.2-.3.4-.3.7s.1.5.3.7c.2.2.4.3.7.3h11c.3 0 .5-.1.7-.3.2-.2.3-.5.3-.7s-.1-.5-.3-.7zM5.8 14.7l6.2 6.3 6.2-6.3c.2-.2.3-.5.3-.7s-.1-.5-.3-.7c-.2-.2-.4-.3-.7-.3h-11c-.3 0-.5.1-.7.3-.2.2-.3.5-.3.7s.1.5.3.7z\"\/><\/svg><\/span><\/span><\/span><\/a><\/span><\/div>\n<nav><ul class='ez-toc-list ez-toc-list-level-1 eztoc-toggle-hide-by-default' ><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-1\" href=\"https:\/\/www.epw.com\/blog\/project-management-articles\/coordinate-vendors-project-life-cycle\/#Key_takeaways\" >Key takeaways<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-2\" href=\"https:\/\/www.epw.com\/blog\/project-management-articles\/coordinate-vendors-project-life-cycle\/#Vendor_coordination_across_the_life_cycle_at_a_glance\" >Vendor coordination across the life cycle at a glance<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-3\" href=\"https:\/\/www.epw.com\/blog\/project-management-articles\/coordinate-vendors-project-life-cycle\/#How_to_coordinate_vendors_in_eight_practical_steps\" >How to coordinate vendors in eight practical steps<\/a><ul class='ez-toc-list-level-3' ><li class='ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-4\" href=\"https:\/\/www.epw.com\/blog\/project-management-articles\/coordinate-vendors-project-life-cycle\/#1_Classify_the_vendor_and_define_the_delivery_outcome\" >1. Classify the vendor and define the delivery outcome<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-5\" href=\"https:\/\/www.epw.com\/blog\/project-management-articles\/coordinate-vendors-project-life-cycle\/#2_Establish_roles_authority_and_one_route_for_instruction\" >2. Establish roles, authority and one route for instruction<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-6\" href=\"https:\/\/www.epw.com\/blog\/project-management-articles\/coordinate-vendors-project-life-cycle\/#3_Translate_the_contract_into_a_coordination_control_plan\" >3. Translate the contract into a coordination control plan<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-7\" href=\"https:\/\/www.epw.com\/blog\/project-management-articles\/coordinate-vendors-project-life-cycle\/#4_Integrate_vendor_work_into_the_project_schedule\" >4. Integrate vendor work into the project schedule<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-8\" href=\"https:\/\/www.epw.com\/blog\/project-management-articles\/coordinate-vendors-project-life-cycle\/#5_Agree_one_information_and_meeting_cadence\" >5. Agree one information and meeting cadence<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-9\" href=\"https:\/\/www.epw.com\/blog\/project-management-articles\/coordinate-vendors-project-life-cycle\/#6_Monitor_performance_risks_and_interfaces_together\" >6. Monitor performance, risks and interfaces together<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-10\" href=\"https:\/\/www.epw.com\/blog\/project-management-articles\/coordinate-vendors-project-life-cycle\/#7_Control_issues_decisions_and_changes\" >7. Control issues, decisions and changes<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-11\" href=\"https:\/\/www.epw.com\/blog\/project-management-articles\/coordinate-vendors-project-life-cycle\/#8_Manage_acceptance_transition_and_closeout_deliberately\" >8. Manage acceptance, transition and closeout deliberately<\/a><\/li><\/ul><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-12\" href=\"https:\/\/www.epw.com\/blog\/project-management-articles\/coordinate-vendors-project-life-cycle\/#The_EPW_ALIGN_vendor_coordination_model\" >The EPW ALIGN vendor coordination model<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-13\" href=\"https:\/\/www.epw.com\/blog\/project-management-articles\/coordinate-vendors-project-life-cycle\/#Worked_example_coordinating_three_vendors_for_a_system_rollout\" >Worked example: coordinating three vendors for a system rollout<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-14\" href=\"https:\/\/www.epw.com\/blog\/project-management-articles\/coordinate-vendors-project-life-cycle\/#Common_vendor_coordination_mistakes\" >Common vendor coordination mistakes<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-15\" href=\"https:\/\/www.epw.com\/blog\/project-management-articles\/coordinate-vendors-project-life-cycle\/#Vendor_coordination_completion_checklist\" >Vendor coordination completion checklist<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-16\" href=\"https:\/\/www.epw.com\/blog\/project-management-articles\/coordinate-vendors-project-life-cycle\/#Develop_project_procurement_and_coordination_capability\" >Develop project procurement and coordination capability<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-17\" href=\"https:\/\/www.epw.com\/blog\/project-management-articles\/coordinate-vendors-project-life-cycle\/#Conclusion\" >Conclusion<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-18\" href=\"https:\/\/www.epw.com\/blog\/project-management-articles\/coordinate-vendors-project-life-cycle\/#Sources_and_References\" >Sources and References<\/a><\/li><\/ul><\/nav><\/div>\n<h2><span class=\"ez-toc-section\" id=\"Key_takeaways\"><\/span>Key takeaways<span class=\"ez-toc-section-end\"><\/span><\/h2>\n<ul>\n<li>Start coordination before mobilisation by clarifying outcomes, interfaces, authority and acceptance evidence.<\/li>\n<li>Give each vendor one buyer-side coordination owner and one clear route for decisions and escalation.<\/li>\n<li>Connect contractual milestones to the integrated project schedule rather than maintaining an isolated vendor plan.<\/li>\n<li>Measure outcomes, quality, timeliness and risk\u2014not meeting attendance or report volume.<\/li>\n<li>Control changes formally and plan transition, knowledge transfer and final acceptance from the beginning.<\/li>\n<\/ul>\n<h2><span class=\"ez-toc-section\" id=\"Vendor_coordination_across_the_life_cycle_at_a_glance\"><\/span>Vendor coordination across the life cycle at a glance<span class=\"ez-toc-section-end\"><\/span><\/h2>\n<table>\n<thead>\n<tr>\n<th>Life-cycle point<\/th>\n<th>Coordination priority<\/th>\n<th>Essential evidence<\/th>\n<th>Decision or control<\/th>\n<\/tr>\n<\/thead>\n<tbody>\n<tr>\n<td>Definition and sourcing<\/td>\n<td>Outcome, scope, interfaces and market capability<\/td>\n<td>Requirements, assumptions and responsibility map<\/td>\n<td>Confirm that obligations are clear and deliverable<\/td>\n<\/tr>\n<tr>\n<td>Award and mobilisation<\/td>\n<td>People, governance, access, data and initial plan<\/td>\n<td>Mobilisation plan, contact matrix and approved baseline<\/td>\n<td>Authorise work only when prerequisites are ready<\/td>\n<\/tr>\n<tr>\n<td>Delivery<\/td>\n<td>Dependencies, performance, risks and decisions<\/td>\n<td>Status data, quality records, decision log and risk updates<\/td>\n<td>Accept, correct, escalate or change<\/td>\n<\/tr>\n<tr>\n<td>Transition<\/td>\n<td>Operational readiness, support and knowledge transfer<\/td>\n<td>Training, manuals, asset data and readiness evidence<\/td>\n<td>Approve service entry or handover<\/td>\n<\/tr>\n<tr>\n<td>Closeout<\/td>\n<td>Final acceptance, commercial closure and learning<\/td>\n<td>Acceptance record, open-item register and lessons<\/td>\n<td>Close, retain, recover or formally transfer obligations<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<figure class=\"wp-block-image size-large\"><img decoding=\"async\" src=\"https:\/\/assets.epw.com\/blog\/wp-content\/uploads\/2026\/10\/19130639\/vendor-coordination-life-cycle-gates.webp\" alt=\"Five-stage vendor coordination life cycle with evidence and decision gates\" width=\"1200\" height=\"900\" loading=\"lazy\" style=\"max-width:100%;height:auto\" \/><figcaption>Coordination controls change by phase, but accountability and evidence continue from mobilisation to closeout.<\/figcaption><\/figure>\n<h2><span class=\"ez-toc-section\" id=\"How_to_coordinate_vendors_in_eight_practical_steps\"><\/span>How to coordinate vendors in eight practical steps<span class=\"ez-toc-section-end\"><\/span><\/h2>\n<h3><span class=\"ez-toc-section\" id=\"1_Classify_the_vendor_and_define_the_delivery_outcome\"><\/span>1. Classify the vendor and define the delivery outcome<span class=\"ez-toc-section-end\"><\/span><\/h3>\n<p>Begin with the project outcome rather than the supplier\u2019s activity list. State what must be usable, by whom, under which acceptance conditions and by what decision date. Then classify the relationship by delivery criticality, complexity, substitutability, information sensitivity, safety or regulatory exposure, and the number of interfaces with other parties.<\/p>\n<p>This classification determines the intensity of coordination. The UK Groceries Code Adjudicator\u2019s supplier-relationship guidance recommends segmenting suppliers by value and risk, with closer collaboration for high-value or high-risk relationships. The same proportional principle is useful in projects: governance effort should follow exposure, not vendor size alone. See the <a href=\"https:\/\/www.gca.gov.uk\/news\/procurement-essentials-supplier-relationship-management-how-to-manage-supplier-relationships-effectively\/\">GCA\u2019s supplier relationship management guidance<\/a>.<\/p>\n<h3><span class=\"ez-toc-section\" id=\"2_Establish_roles_authority_and_one_route_for_instruction\"><\/span>2. Establish roles, authority and one route for instruction<span class=\"ez-toc-section-end\"><\/span><\/h3>\n<p>Name a buyer-side vendor coordination owner and the vendor\u2019s accountable counterpart. Clarify who may approve scope, accept deliverables, instruct work, agree technical interpretations, authorise changes and release payments. A simple responsibility matrix should cover the sponsor, project manager, procurement lead, contract manager, technical owner, quality lead and end user.<\/p>\n<p>Avoid giving vendors instructions through multiple workstreams. Technical specialists may discuss options, but any direction affecting scope, time, cost, risk or contractual obligations should follow the authorised route. UK government guidance for new contract managers emphasises agreed roles, a contract management plan, mobilisation tracking and cross-functional relationships. These are described in the <a href=\"https:\/\/www.gov.uk\/government\/publications\/civil-service-helping-you-with-managing-suppliers-and-contracts\/initial-guidance-and-signposting-for-new-in-role-contract-managers-html\">Contract Management Professional Standards guidance<\/a>.<\/p>\n<h3><span class=\"ez-toc-section\" id=\"3_Translate_the_contract_into_a_coordination_control_plan\"><\/span>3. Translate the contract into a coordination control plan<span class=\"ez-toc-section-end\"><\/span><\/h3>\n<p>Extract the contract\u2019s operational controls into a working plan. Include deliverables, milestone dates, dependencies, service levels, key performance indicators, acceptance criteria, reporting obligations, warranties, change rules, invoice evidence, remedies and exit duties. Reference the governing clause rather than copying fragments that may become inconsistent with the signed agreement.<\/p>\n<p>For each control, record the owner, evidence source, review frequency, tolerance and action when performance is outside tolerance. The World Bank\u2019s 2025 procurement regulations require a contract management plan with KPIs and milestone events for identified contracts, followed by performance monitoring and timely reporting. This supports a wider lesson: performance measures are useful only when connected to ownership and decisions. See the <a href=\"https:\/\/thedocs.worldbank.org\/en\/doc\/c84273d1b230aeb2b0b8134de5dc8cd7-0290012025\/original\/Procurement-Regulations-7th-Edition-Sep-2025.pdf\">World Bank Procurement Regulations for IPF Borrowers<\/a>.<\/p>\n<h3><span class=\"ez-toc-section\" id=\"4_Integrate_vendor_work_into_the_project_schedule\"><\/span>4. Integrate vendor work into the project schedule<span class=\"ez-toc-section-end\"><\/span><\/h3>\n<p>Build vendor activities into the integrated project schedule at the level needed to manage interfaces. Include buyer-provided information, access, approvals and decisions as well as vendor production, review, correction, delivery and acceptance. Link dependencies between vendors so that a delay in one workstream produces visible consequences elsewhere.<\/p>\n<p>Use interface milestones with unambiguous definitions: \u201cdesign complete\u201d is weak if nobody knows whether it means submitted, reviewed or approved. A stronger milestone names the required state and evidence, such as \u201cinterface design approved by the technical authority\u201d. EPW\u2019s <a href=\"https:\/\/www.epw.com\/training\/advanced-project-planning-and-control-techniques\">Advanced Project Planning and Control Techniques course<\/a> develops the planning and control discipline needed to maintain these links.<\/p>\n<h3><span class=\"ez-toc-section\" id=\"5_Agree_one_information_and_meeting_cadence\"><\/span>5. Agree one information and meeting cadence<span class=\"ez-toc-section-end\"><\/span><\/h3>\n<p>Define what each forum is for. A short operational meeting may remove delivery blockers; a technical review may resolve design questions; a commercial review may examine performance, change and payment; an executive forum may decide escalated issues. Do not combine every topic into one oversized status meeting.<\/p>\n<p>Use one controlled source for current plans, actions, decisions, risks, deliverables and approved documents. Agree data cut-off dates, reporting definitions and version rules. EPW\u2019s <a href=\"https:\/\/www.epw.com\/training\/project-communication-and-reporting-techniques\">Project Communication and Reporting Techniques course<\/a> provides a useful development route for project teams that need clearer status evidence and decision-ready reporting.<\/p>\n<h3><span class=\"ez-toc-section\" id=\"6_Monitor_performance_risks_and_interfaces_together\"><\/span>6. Monitor performance, risks and interfaces together<span class=\"ez-toc-section-end\"><\/span><\/h3>\n<p>Review performance against the contract and project need. A vendor can meet a narrow reporting KPI while an unresolved interface still threatens the outcome. Combine lagging measures, such as accepted deliverables and defect levels, with leading indicators, such as overdue decisions, forecast milestone movement, resource gaps, repeat quality observations and ageing actions.<\/p>\n<p>UK government contract-management principles recommend using KPIs and data to manage contracts proactively, while balancing hard performance data with customer satisfaction and relationship measures. They also advise reviewing measures as the contract evolves. See the official <a href=\"https:\/\/www.gov.uk\/government\/publications\/commercial-capability-contract-management-standards\/contract-management-principles\">contract management principles<\/a>.<\/p>\n<h3><span class=\"ez-toc-section\" id=\"7_Control_issues_decisions_and_changes\"><\/span>7. Control issues, decisions and changes<span class=\"ez-toc-section-end\"><\/span><\/h3>\n<p>Separate four records: actions describe work to do; issues describe present problems; risks describe uncertain future events; and changes alter an approved baseline or obligation. Give every item an owner, due date, status and escalation threshold. Record material decisions with the options considered, authority, date and consequences.<\/p>\n<p>Do not let urgent delivery pressure create informal scope. Assess the schedule, cost, quality, risk, operational and contractual effects before approving a change. Government guidance explicitly advises planning for change through joint work with suppliers while retaining strong change control and senior assurance. Project teams can strengthen this discipline through EPW\u2019s <a href=\"https:\/\/www.epw.com\/training\/project-risk-management-and-mitigation-strategies\">Project Risk Management and Mitigation Strategies course<\/a>.<\/p>\n<h3><span class=\"ez-toc-section\" id=\"8_Manage_acceptance_transition_and_closeout_deliberately\"><\/span>8. Manage acceptance, transition and closeout deliberately<span class=\"ez-toc-section-end\"><\/span><\/h3>\n<p>Plan closeout requirements during mobilisation, not in the final week. Define acceptance tests, defect treatment, documentation, data and asset handover, training, support, warranties, intellectual property, access removal, final accounts and unresolved claims. Assign the future owner of any obligation that continues after project closure.<\/p>\n<p>Government guidance groups contract management around mobilisation, service provision and supplier relationship management, while its professional standards include delivery, exit and transition. The practical implication is that closing a purchase order is not the same as proving operational readiness or completing knowledge transfer. See the <a href=\"https:\/\/www.gca.gov.uk\/news\/effective-contract-management-procurement-ccs\">GCA\u2019s contract lifecycle overview<\/a>.<\/p>\n<h2><span class=\"ez-toc-section\" id=\"The_EPW_ALIGN_vendor_coordination_model\"><\/span>The EPW ALIGN vendor coordination model<span class=\"ez-toc-section-end\"><\/span><\/h2>\n<p>Use ALIGN as a compact control when a project has several vendors or complicated interfaces:<\/p>\n<table>\n<thead>\n<tr>\n<th>Element<\/th>\n<th>Management question<\/th>\n<th>Minimum evidence<\/th>\n<\/tr>\n<\/thead>\n<tbody>\n<tr>\n<td><strong>A \u2014 Accountability<\/strong><\/td>\n<td>Who may instruct, decide, accept and escalate?<\/td>\n<td>Governance and responsibility matrix<\/td>\n<\/tr>\n<tr>\n<td><strong>L \u2014 Lifecycle obligations<\/strong><\/td>\n<td>What must happen from mobilisation to exit?<\/td>\n<td>Contract control plan<\/td>\n<\/tr>\n<tr>\n<td><strong>I \u2014 Interfaces<\/strong><\/td>\n<td>Which party needs what from whom, and when?<\/td>\n<td>Interface register and integrated schedule links<\/td>\n<\/tr>\n<tr>\n<td><strong>G \u2014 Governance cadence<\/strong><\/td>\n<td>Where are performance, risks and decisions reviewed?<\/td>\n<td>Meeting map, reporting calendar and decision log<\/td>\n<\/tr>\n<tr>\n<td><strong>N \u2014 Next-state readiness<\/strong><\/td>\n<td>What proves acceptance, transition and closure?<\/td>\n<td>Readiness, handover and closeout checklist<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<figure class=\"wp-block-image size-large\"><img decoding=\"async\" src=\"https:\/\/assets.epw.com\/blog\/wp-content\/uploads\/2026\/10\/19130655\/epw-align-vendor-coordination-model.webp\" alt=\"EPW ALIGN vendor coordination model linking accountability, lifecycle, interfaces, governance and readiness\" width=\"1200\" height=\"900\" loading=\"lazy\" style=\"max-width:100%;height:auto\" \/><figcaption>ALIGN keeps vendor coordination focused on accountable decisions, managed interfaces and verified readiness.<\/figcaption><\/figure>\n<h2><span class=\"ez-toc-section\" id=\"Worked_example_coordinating_three_vendors_for_a_system_rollout\"><\/span>Worked example: coordinating three vendors for a system rollout<span class=\"ez-toc-section-end\"><\/span><\/h2>\n<p>Consider a project in which one vendor supplies software, another migrates data and a third provides user training. The software vendor cannot complete configuration until the client approves the process design. The migration vendor needs a stable data model, while the training vendor needs an approved system and realistic scenarios.<\/p>\n<p>The project manager maps these dependencies in one schedule and creates three interface milestones: data model approved, test environment accepted and training release authorised. The contract manager maps each milestone to acceptance evidence and payment conditions. Weekly operational reviews address blockers; a fortnightly integration review examines cross-vendor dependencies; and only the authorised change board may approve baseline changes.<\/p>\n<p>When the software configuration slips, the team does not simply ask all vendors to \u201cwork faster\u201d. It analyses the affected interfaces, protects migration validation, changes the training sequence, records commercial consequences and obtains an authorised decision. Coordination turns one vendor\u2019s forecast into an integrated project response.<\/p>\n<h2><span class=\"ez-toc-section\" id=\"Common_vendor_coordination_mistakes\"><\/span>Common vendor coordination mistakes<span class=\"ez-toc-section-end\"><\/span><\/h2>\n<ul>\n<li><strong>Starting after award:<\/strong> define interfaces, acceptance and governance while requirements and contracts are being developed.<\/li>\n<li><strong>Multiple instruction channels:<\/strong> separate technical discussion from authorised direction.<\/li>\n<li><strong>Vendor-only schedules:<\/strong> include buyer actions, approvals and cross-vendor dependencies.<\/li>\n<li><strong>Too many KPIs:<\/strong> select a small balanced set linked to outcomes and management action.<\/li>\n<li><strong>Meeting without evidence:<\/strong> use controlled data, named owners and recorded decisions.<\/li>\n<li><strong>Informal change:<\/strong> assess and approve baseline effects before work proceeds.<\/li>\n<li><strong>Late transition planning:<\/strong> define readiness and handover evidence during mobilisation.<\/li>\n<\/ul>\n<h2><span class=\"ez-toc-section\" id=\"Vendor_coordination_completion_checklist\"><\/span>Vendor coordination completion checklist<span class=\"ez-toc-section-end\"><\/span><\/h2>\n<ul>\n<li>The delivery outcome and acceptance conditions are unambiguous.<\/li>\n<li>Vendor criticality and coordination intensity are proportionate to risk.<\/li>\n<li>Instruction, approval, acceptance and escalation authority are documented.<\/li>\n<li>Contract deliverables, KPIs, milestones and evidence have named owners.<\/li>\n<li>Buyer, vendor and cross-vendor dependencies appear in one integrated schedule.<\/li>\n<li>Forums have distinct purposes, inputs, decisions and records.<\/li>\n<li>Risks, issues, actions, decisions and changes are controlled separately.<\/li>\n<li>Transition, knowledge transfer, access, warranties and closure are planned.<\/li>\n<\/ul>\n<h2><span class=\"ez-toc-section\" id=\"Develop_project_procurement_and_coordination_capability\"><\/span>Develop project procurement and coordination capability<span class=\"ez-toc-section-end\"><\/span><\/h2>\n<p>Vendor coordination requires commercial judgement as well as project control. Professionals can compare related development routes through EPW\u2019s <a href=\"https:\/\/www.epw.com\/courses\/project-management-training\">Project Management Training Courses<\/a> and its broader <a href=\"https:\/\/www.epw.com\/courses\/procurement-supply-chain-management\">Procurement and Supply Chain Management Training Courses<\/a>.<\/p>\n<p>Ready to apply a disciplined vendor coordination method to live projects? Explore EPW\u2019s <a href=\"https:\/\/www.epw.com\/training\/project-procurement-and-vendor-coordination\"><strong>Project Procurement and Vendor Coordination course<\/strong><\/a>, review available dates and locations, or request tailored in-house training.<\/p>\n<h2><span class=\"ez-toc-section\" id=\"Conclusion\"><\/span>Conclusion<span class=\"ez-toc-section-end\"><\/span><\/h2>\n<p>Effective vendor coordination connects the commercial agreement to the delivery system. It makes authority visible, integrates dependencies, turns performance data into decisions and carries acceptance evidence through to transition and closeout. When the approach is proportionate and well documented, the project team can collaborate constructively without weakening accountability or contractual control.<\/p>\n<h2><span class=\"ez-toc-section\" id=\"Sources_and_References\"><\/span>Sources and References<span class=\"ez-toc-section-end\"><\/span><\/h2>\n<ol>\n<li>Groceries Code Adjudicator. <em>Supplier relationship management: how to manage supplier relationships effectively<\/em>. 17 October 2025. <a href=\"https:\/\/www.gca.gov.uk\/news\/procurement-essentials-supplier-relationship-management-how-to-manage-supplier-relationships-effectively\/\">https:\/\/www.gca.gov.uk\/news\/procurement-essentials-supplier-relationship-management-how-to-manage-supplier-relationships-effectively\/<\/a><\/li>\n<li>UK Cabinet Office and Government Commercial Function. <em>Initial guidance and signposting for new-in-role contract managers<\/em>. Updated 13 August 2026. <a href=\"https:\/\/www.gov.uk\/government\/publications\/civil-service-helping-you-with-managing-suppliers-and-contracts\/initial-guidance-and-signposting-for-new-in-role-contract-managers-html\">https:\/\/www.gov.uk\/government\/publications\/civil-service-helping-you-with-managing-suppliers-and-contracts\/initial-guidance-and-signposting-for-new-in-role-contract-managers-html<\/a><\/li>\n<li>World Bank. <em>Procurement Regulations for IPF Borrowers<\/em>, seventh edition. September 2025. <a href=\"https:\/\/thedocs.worldbank.org\/en\/doc\/c84273d1b230aeb2b0b8134de5dc8cd7-0290012025\/original\/Procurement-Regulations-7th-Edition-Sep-2025.pdf\">https:\/\/thedocs.worldbank.org\/en\/doc\/c84273d1b230aeb2b0b8134de5dc8cd7-0290012025\/original\/Procurement-Regulations-7th-Edition-Sep-2025.pdf<\/a><\/li>\n<li>UK Cabinet Office. <em>Contract management principles<\/em>. Updated 12 December 2025. <a href=\"https:\/\/www.gov.uk\/government\/publications\/commercial-capability-contract-management-standards\/contract-management-principles\">https:\/\/www.gov.uk\/government\/publications\/commercial-capability-contract-management-standards\/contract-management-principles<\/a><\/li>\n<li>International Organization for Standardization. <em>ISO 44001:2017 \u2014 Collaborative business relationship management systems<\/em>. Accessed 8 September 2026. <a href=\"https:\/\/www.iso.org\/standard\/72798.html\">https:\/\/www.iso.org\/standard\/72798.html<\/a><\/li>\n<\/ol>\n","protected":false},"excerpt":{"rendered":"<p>A practical eight-step method for coordinating vendors through mobilisation, delivery, transition and closeout using accountable governance, integrated schedules and evidence-based controls for complex projects and cross-functional delivery teams.<\/p>\n","protected":false},"author":1,"featured_media":3835,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[29],"tags":[114,33,88],"class_list":["post-2648","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-project-management-articles","tag-contract-management","tag-project-management","tag-supplier-management"],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v25.7 - https:\/\/yoast.com\/wordpress\/plugins\/seo\/ -->\n<title>How to Coordinate Vendors Across the Project Life Cycle<\/title>\n<meta name=\"description\" content=\"Learn how to coordinate vendors across the project life cycle with clear ownership, integrated schedules, performance controls and evidence-based decisions.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.epw.com\/blog\/project-management-articles\/coordinate-vendors-project-life-cycle\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"How to Coordinate Vendors Across the Project Life Cycle\" \/>\n<meta property=\"og:description\" content=\"Learn how to coordinate vendors across the project life cycle with clear ownership, integrated schedules, performance controls and evidence-based decisions.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.epw.com\/blog\/project-management-articles\/coordinate-vendors-project-life-cycle\" \/>\n<meta property=\"og:site_name\" content=\"Blog Categories - EPW Training\" \/>\n<meta property=\"article:published_time\" content=\"2026-10-19T13:12:09+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2026-10-19T13:12:10+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/assets.epw.com\/blog\/wp-content\/uploads\/2026\/10\/19130609\/coordinate-vendors-project-life-cycle.webp\" \/>\n\t<meta property=\"og:image:width\" content=\"1280\" \/>\n\t<meta property=\"og:image:height\" content=\"720\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/webp\" \/>\n<meta name=\"author\" content=\"EPW Training Blog\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"EPW Training Blog\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"9 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":[\"Article\",\"BlogPosting\"],\"@id\":\"https:\/\/www.epw.com\/blog\/project-management-articles\/coordinate-vendors-project-life-cycle#article\",\"isPartOf\":{\"@id\":\"https:\/\/www.epw.com\/blog\/project-management-articles\/coordinate-vendors-project-life-cycle\"},\"author\":{\"@type\":\"Organization\",\"name\":\"EPW Training Blog\",\"url\":\"https:\/\/www.epw.com\/blog\/\",\"@id\":\"https:\/\/www.epw.com\/blog\/#organization\"},\"headline\":\"How to Coordinate Vendors Across the Project Life Cycle\",\"datePublished\":\"2026-10-19T13:12:09+00:00\",\"dateModified\":\"2026-10-19T13:12:10+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\/\/www.epw.com\/blog\/project-management-articles\/coordinate-vendors-project-life-cycle\"},\"wordCount\":1873,\"publisher\":{\"@id\":\"https:\/\/www.epw.com\/blog\/#organization\"},\"image\":{\"@id\":\"https:\/\/www.epw.com\/blog\/project-management-articles\/coordinate-vendors-project-life-cycle#primaryimage\"},\"thumbnailUrl\":\"https:\/\/assets.epw.com\/blog\/wp-content\/uploads\/2026\/10\/19130609\/coordinate-vendors-project-life-cycle.webp\",\"keywords\":[\"Contract Management\",\"project management\",\"Supplier Management\"],\"articleSection\":[\"Project Management Articles\"],\"inLanguage\":\"en-US\"},{\"@type\":\"WebPage\",\"@id\":\"https:\/\/www.epw.com\/blog\/project-management-articles\/coordinate-vendors-project-life-cycle\",\"url\":\"https:\/\/www.epw.com\/blog\/project-management-articles\/coordinate-vendors-project-life-cycle\",\"name\":\"How to Coordinate Vendors Across the Project Life Cycle\",\"isPartOf\":{\"@id\":\"https:\/\/www.epw.com\/blog\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\/\/www.epw.com\/blog\/project-management-articles\/coordinate-vendors-project-life-cycle#primaryimage\"},\"image\":{\"@id\":\"https:\/\/www.epw.com\/blog\/project-management-articles\/coordinate-vendors-project-life-cycle#primaryimage\"},\"thumbnailUrl\":\"https:\/\/assets.epw.com\/blog\/wp-content\/uploads\/2026\/10\/19130609\/coordinate-vendors-project-life-cycle.webp\",\"datePublished\":\"2026-10-19T13:12:09+00:00\",\"dateModified\":\"2026-10-19T13:12:10+00:00\",\"description\":\"Learn how to coordinate vendors across the project life cycle with clear ownership, integrated schedules, performance controls and evidence-based decisions.\",\"breadcrumb\":{\"@id\":\"https:\/\/www.epw.com\/blog\/project-management-articles\/coordinate-vendors-project-life-cycle#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/www.epw.com\/blog\/project-management-articles\/coordinate-vendors-project-life-cycle\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/www.epw.com\/blog\/project-management-articles\/coordinate-vendors-project-life-cycle#primaryimage\",\"url\":\"https:\/\/assets.epw.com\/blog\/wp-content\/uploads\/2026\/10\/19130609\/coordinate-vendors-project-life-cycle.webp\",\"contentUrl\":\"https:\/\/assets.epw.com\/blog\/wp-content\/uploads\/2026\/10\/19130609\/coordinate-vendors-project-life-cycle.webp\",\"width\":1280,\"height\":720,\"caption\":\"Effective vendor coordination connects contractual obligations, project interfaces and evidence-based decisions.\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/www.epw.com\/blog\/project-management-articles\/coordinate-vendors-project-life-cycle#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\/\/www.epw.com\/blog\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"How to Coordinate Vendors Across the Project Life Cycle\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/www.epw.com\/blog\/#website\",\"url\":\"https:\/\/www.epw.com\/blog\/\",\"name\":\"Blog Categories - EPW Training\",\"description\":\"Expert Insights and Updates in Professional Training\",\"publisher\":{\"@id\":\"https:\/\/www.epw.com\/blog\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/www.epw.com\/blog\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\/\/www.epw.com\/blog\/#organization\",\"name\":\"Blog Categories - EPW Training\",\"url\":\"https:\/\/www.epw.com\/blog\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/www.epw.com\/blog\/#\/schema\/logo\/image\/\",\"url\":\"https:\/\/www.epw.com\/blog\/wp-content\/uploads\/2025\/08\/epw-training-blog-logo.png\",\"contentUrl\":\"https:\/\/www.epw.com\/blog\/wp-content\/uploads\/2025\/08\/epw-training-blog-logo.png\",\"width\":746,\"height\":256,\"caption\":\"Blog Categories - EPW Training\"},\"image\":{\"@id\":\"https:\/\/www.epw.com\/blog\/#\/schema\/logo\/image\/\"}},{\"@type\":\"Person\",\"@id\":\"https:\/\/www.epw.com\/blog\/#person\",\"name\":\"EPW Training Blog\",\"sameAs\":[\"https:\/\/www.epw.com\/blog\/\"],\"url\":\"https:\/\/www.epw.com\/blog\/\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"How to Coordinate Vendors Across the Project Life Cycle","description":"Learn how to coordinate vendors across the project life cycle with clear ownership, integrated schedules, performance controls and evidence-based decisions.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.epw.com\/blog\/project-management-articles\/coordinate-vendors-project-life-cycle","og_locale":"en_US","og_type":"article","og_title":"How to Coordinate Vendors Across the Project Life Cycle","og_description":"Learn how to coordinate vendors across the project life cycle with clear ownership, integrated schedules, performance controls and evidence-based decisions.","og_url":"https:\/\/www.epw.com\/blog\/project-management-articles\/coordinate-vendors-project-life-cycle","og_site_name":"Blog Categories - EPW Training","article_published_time":"2026-10-19T13:12:09+00:00","article_modified_time":"2026-10-19T13:12:10+00:00","og_image":[{"width":1280,"height":720,"url":"https:\/\/assets.epw.com\/blog\/wp-content\/uploads\/2026\/10\/19130609\/coordinate-vendors-project-life-cycle.webp","type":"image\/webp"}],"author":"EPW Training Blog","twitter_card":"summary_large_image","twitter_misc":{"Written by":"EPW Training Blog","Est. reading time":"9 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":["Article","BlogPosting"],"@id":"https:\/\/www.epw.com\/blog\/project-management-articles\/coordinate-vendors-project-life-cycle#article","isPartOf":{"@id":"https:\/\/www.epw.com\/blog\/project-management-articles\/coordinate-vendors-project-life-cycle"},"author":{"@type":"Organization","name":"EPW Training Blog","url":"https:\/\/www.epw.com\/blog\/","@id":"https:\/\/www.epw.com\/blog\/#organization"},"headline":"How to Coordinate Vendors Across the Project Life Cycle","datePublished":"2026-10-19T13:12:09+00:00","dateModified":"2026-10-19T13:12:10+00:00","mainEntityOfPage":{"@id":"https:\/\/www.epw.com\/blog\/project-management-articles\/coordinate-vendors-project-life-cycle"},"wordCount":1873,"publisher":{"@id":"https:\/\/www.epw.com\/blog\/#organization"},"image":{"@id":"https:\/\/www.epw.com\/blog\/project-management-articles\/coordinate-vendors-project-life-cycle#primaryimage"},"thumbnailUrl":"https:\/\/assets.epw.com\/blog\/wp-content\/uploads\/2026\/10\/19130609\/coordinate-vendors-project-life-cycle.webp","keywords":["Contract Management","project management","Supplier Management"],"articleSection":["Project Management Articles"],"inLanguage":"en-US"},{"@type":"WebPage","@id":"https:\/\/www.epw.com\/blog\/project-management-articles\/coordinate-vendors-project-life-cycle","url":"https:\/\/www.epw.com\/blog\/project-management-articles\/coordinate-vendors-project-life-cycle","name":"How to Coordinate Vendors Across the Project Life Cycle","isPartOf":{"@id":"https:\/\/www.epw.com\/blog\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.epw.com\/blog\/project-management-articles\/coordinate-vendors-project-life-cycle#primaryimage"},"image":{"@id":"https:\/\/www.epw.com\/blog\/project-management-articles\/coordinate-vendors-project-life-cycle#primaryimage"},"thumbnailUrl":"https:\/\/assets.epw.com\/blog\/wp-content\/uploads\/2026\/10\/19130609\/coordinate-vendors-project-life-cycle.webp","datePublished":"2026-10-19T13:12:09+00:00","dateModified":"2026-10-19T13:12:10+00:00","description":"Learn how to coordinate vendors across the project life cycle with clear ownership, integrated schedules, performance controls and evidence-based decisions.","breadcrumb":{"@id":"https:\/\/www.epw.com\/blog\/project-management-articles\/coordinate-vendors-project-life-cycle#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.epw.com\/blog\/project-management-articles\/coordinate-vendors-project-life-cycle"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.epw.com\/blog\/project-management-articles\/coordinate-vendors-project-life-cycle#primaryimage","url":"https:\/\/assets.epw.com\/blog\/wp-content\/uploads\/2026\/10\/19130609\/coordinate-vendors-project-life-cycle.webp","contentUrl":"https:\/\/assets.epw.com\/blog\/wp-content\/uploads\/2026\/10\/19130609\/coordinate-vendors-project-life-cycle.webp","width":1280,"height":720,"caption":"Effective vendor coordination connects contractual obligations, project interfaces and evidence-based decisions."},{"@type":"BreadcrumbList","@id":"https:\/\/www.epw.com\/blog\/project-management-articles\/coordinate-vendors-project-life-cycle#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.epw.com\/blog"},{"@type":"ListItem","position":2,"name":"How to Coordinate Vendors Across the Project Life Cycle"}]},{"@type":"WebSite","@id":"https:\/\/www.epw.com\/blog\/#website","url":"https:\/\/www.epw.com\/blog\/","name":"Blog Categories - EPW Training","description":"Expert Insights and Updates in Professional Training","publisher":{"@id":"https:\/\/www.epw.com\/blog\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.epw.com\/blog\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/www.epw.com\/blog\/#organization","name":"Blog Categories - EPW Training","url":"https:\/\/www.epw.com\/blog\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.epw.com\/blog\/#\/schema\/logo\/image\/","url":"https:\/\/www.epw.com\/blog\/wp-content\/uploads\/2025\/08\/epw-training-blog-logo.png","contentUrl":"https:\/\/www.epw.com\/blog\/wp-content\/uploads\/2025\/08\/epw-training-blog-logo.png","width":746,"height":256,"caption":"Blog Categories - EPW Training"},"image":{"@id":"https:\/\/www.epw.com\/blog\/#\/schema\/logo\/image\/"}},{"@type":"Person","@id":"https:\/\/www.epw.com\/blog\/#person","name":"EPW Training Blog","sameAs":["https:\/\/www.epw.com\/blog\/"],"url":"https:\/\/www.epw.com\/blog\/"}]}},"_links":{"self":[{"href":"https:\/\/www.epw.com\/blog\/wp-json\/wp\/v2\/posts\/2648","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.epw.com\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.epw.com\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.epw.com\/blog\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.epw.com\/blog\/wp-json\/wp\/v2\/comments?post=2648"}],"version-history":[{"count":2,"href":"https:\/\/www.epw.com\/blog\/wp-json\/wp\/v2\/posts\/2648\/revisions"}],"predecessor-version":[{"id":3840,"href":"https:\/\/www.epw.com\/blog\/wp-json\/wp\/v2\/posts\/2648\/revisions\/3840"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.epw.com\/blog\/wp-json\/wp\/v2\/media\/3835"}],"wp:attachment":[{"href":"https:\/\/www.epw.com\/blog\/wp-json\/wp\/v2\/media?parent=2648"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.epw.com\/blog\/wp-json\/wp\/v2\/categories?post=2648"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.epw.com\/blog\/wp-json\/wp\/v2\/tags?post=2648"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}