{"id":2405,"date":"2026-09-10T06:27:50","date_gmt":"2026-09-10T06:27:50","guid":{"rendered":"https:\/\/www.epw.com\/blog\/?p=2405"},"modified":"2026-09-13T08:25:57","modified_gmt":"2026-09-13T08:25:57","slug":"project-risk-examples-mitigation-actions","status":"publish","type":"post","link":"https:\/\/www.epw.com\/blog\/project-management-articles\/project-risk-examples-mitigation-actions","title":{"rendered":"15 Project Risk Examples and Effective Mitigation Actions"},"content":{"rendered":"<p class=\"epw-featured-image-caption\"><em>AI-generated illustration created to represent the article\u2019s subject. It does not depict an actual EPW course, trainer, participant, client, event or venue.<\/em><\/p>\n<p><!-- EPW PRODUCTION BRIEF\nPrimary topic: Project risk examples and mitigation actions\nPrimary query: project risk examples\nSearch intent: Informational\nPrimary article type: List \/ Examples\nAudience: Project managers, risk owners, sponsors and PMO professionals preparing or reviewing project risk registers\nDesired action: Use the examples to improve identification and response planning, then explore relevant EPW training\nExisting EPW content: Full Published and Draft lists checked for title, slug, topic and equivalent intent; no competing project-level examples article found\nOriginal EPW value: Fifteen grouped examples plus the EPW ACTION response test\nPrimary CTA: https:\/\/www.epw.com\/training\/project-risk-management-and-mitigation-strategies\nCategory: Project Management Articles\nTags: Project Management; Risk Management; Risk Assessment\nSchema: BlogPosting\n--><\/p>\n<p><strong>Useful project risk examples describe an uncertain event, its cause and its effect on an objective.<\/strong> Common examples include late approvals, inaccurate estimates, resource conflicts, supplier failure, requirements volatility, integration defects and weak operational readiness. Project managers should adapt\u2014not copy\u2014the examples below, assign an accountable owner and select mitigation that changes the likelihood or impact.<\/p>\n<p>A risk is not merely a problem statement. ISO 31000 provides principles, a framework and a process for managing uncertainty, while PMI&#8217;s project-risk guidance covers techniques and good practices across portfolios, programmes and projects. Both sources support a structured approach connected to objectives and decisions rather than a static list maintained for compliance. <a href=\"https:\/\/www.iso.org\/standard\/65694.html\">ISO 31000:2018<\/a>; <a href=\"https:\/\/www.pmi.org\/standards\/risk-management\">PMI Risk Management in Portfolios, Programs, and Projects<\/a>.<\/p>\n<nav aria-label=\"Table of contents\">\n  <strong>In this article<\/strong><\/p>\n<ul>\n<li><a href=\"#examples-at-a-glance\">15 project risk examples at a glance<\/a><\/li>\n<li><a href=\"#governance-planning\">Governance and planning risks<\/a><\/li>\n<li><a href=\"#delivery-technical\">Delivery and technical risks<\/a><\/li>\n<li><a href=\"#commercial-people\">Commercial and people risks<\/a><\/li>\n<li><a href=\"#transition-external\">Transition and external risks<\/a><\/li>\n<li><a href=\"#action-test\">The EPW ACTION response test<\/a><\/li>\n<\/ul>\n<\/nav>\n<div id=\"ez-toc-container\" class=\"ez-toc-v2_0_82_2 counter-hierarchy ez-toc-counter ez-toc-custom ez-toc-container-direction\">\n<div class=\"ez-toc-title-container\">\n<p class=\"ez-toc-title\" style=\"cursor:inherit\">Table of Contents<\/p>\n<span class=\"ez-toc-title-toggle\"><a href=\"#\" class=\"ez-toc-pull-right ez-toc-btn ez-toc-btn-xs ez-toc-btn-default ez-toc-toggle\" aria-label=\"Toggle Table of Content\"><span class=\"ez-toc-js-icon-con\"><span class=\"\"><span class=\"eztoc-hide\" style=\"display:none;\">Toggle<\/span><span class=\"ez-toc-icon-toggle-span\"><svg style=\"fill: #dd0808;color:#dd0808\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\" class=\"list-377408\" width=\"20px\" height=\"20px\" viewBox=\"0 0 24 24\" fill=\"none\"><path d=\"M6 6H4v2h2V6zm14 0H8v2h12V6zM4 11h2v2H4v-2zm16 0H8v2h12v-2zM4 16h2v2H4v-2zm16 0H8v2h12v-2z\" fill=\"currentColor\"><\/path><\/svg><svg style=\"fill: #dd0808;color:#dd0808\" class=\"arrow-unsorted-368013\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\" width=\"10px\" height=\"10px\" viewBox=\"0 0 24 24\" version=\"1.2\" baseProfile=\"tiny\"><path d=\"M18.2 9.3l-6.2-6.3-6.2 6.3c-.2.2-.3.4-.3.7s.1.5.3.7c.2.2.4.3.7.3h11c.3 0 .5-.1.7-.3.2-.2.3-.5.3-.7s-.1-.5-.3-.7zM5.8 14.7l6.2 6.3 6.2-6.3c.2-.2.3-.5.3-.7s-.1-.5-.3-.7c-.2-.2-.4-.3-.7-.3h-11c-.3 0-.5.1-.7.3-.2.2-.3.5-.3.7s.1.5.3.7z\"\/><\/svg><\/span><\/span><\/span><\/a><\/span><\/div>\n<nav><ul class='ez-toc-list ez-toc-list-level-1 eztoc-toggle-hide-by-default' ><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-1\" href=\"https:\/\/www.epw.com\/blog\/project-management-articles\/project-risk-examples-mitigation-actions\/#15_project_risk_examples_at_a_glance\" >15 project risk examples at a glance<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-2\" href=\"https:\/\/www.epw.com\/blog\/project-management-articles\/project-risk-examples-mitigation-actions\/#Governance_and_planning_risks\" >Governance and planning risks<\/a><ul class='ez-toc-list-level-3' ><li class='ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-3\" href=\"https:\/\/www.epw.com\/blog\/project-management-articles\/project-risk-examples-mitigation-actions\/#1_Strategic_priorities_change\" >1. Strategic priorities change<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-4\" href=\"https:\/\/www.epw.com\/blog\/project-management-articles\/project-risk-examples-mitigation-actions\/#2_A_critical_approval_arrives_late\" >2. A critical approval arrives late<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-5\" href=\"https:\/\/www.epw.com\/blog\/project-management-articles\/project-risk-examples-mitigation-actions\/#3_The_estimate_is_materially_inaccurate\" >3. The estimate is materially inaccurate<\/a><\/li><\/ul><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-6\" href=\"https:\/\/www.epw.com\/blog\/project-management-articles\/project-risk-examples-mitigation-actions\/#Delivery_and_technical_risks\" >Delivery and technical risks<\/a><ul class='ez-toc-list-level-3' ><li class='ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-7\" href=\"https:\/\/www.epw.com\/blog\/project-management-articles\/project-risk-examples-mitigation-actions\/#4_Requirements_continue_to_change\" >4. Requirements continue to change<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-8\" href=\"https:\/\/www.epw.com\/blog\/project-management-articles\/project-risk-examples-mitigation-actions\/#5_A_critical_dependency_is_late\" >5. A critical dependency is late<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-9\" href=\"https:\/\/www.epw.com\/blog\/project-management-articles\/project-risk-examples-mitigation-actions\/#6_Technical_integration_fails\" >6. Technical integration fails<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-10\" href=\"https:\/\/www.epw.com\/blog\/project-management-articles\/project-risk-examples-mitigation-actions\/#7_Quality_defects_create_rework\" >7. Quality defects create rework<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-11\" href=\"https:\/\/www.epw.com\/blog\/project-management-articles\/project-risk-examples-mitigation-actions\/#8_Data_migration_is_incomplete_or_inaccurate\" >8. Data migration is incomplete or inaccurate<\/a><\/li><\/ul><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-12\" href=\"https:\/\/www.epw.com\/blog\/project-management-articles\/project-risk-examples-mitigation-actions\/#Commercial_and_people_risks\" >Commercial and people risks<\/a><ul class='ez-toc-list-level-3' ><li class='ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-13\" href=\"https:\/\/www.epw.com\/blog\/project-management-articles\/project-risk-examples-mitigation-actions\/#9_Supplier_performance_deteriorates\" >9. Supplier performance deteriorates<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-14\" href=\"https:\/\/www.epw.com\/blog\/project-management-articles\/project-risk-examples-mitigation-actions\/#10_Price_or_currency_movement_increases_cost\" >10. Price or currency movement increases cost<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-15\" href=\"https:\/\/www.epw.com\/blog\/project-management-articles\/project-risk-examples-mitigation-actions\/#11_Specialist_capacity_is_unavailable\" >11. Specialist capacity is unavailable<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-16\" href=\"https:\/\/www.epw.com\/blog\/project-management-articles\/project-risk-examples-mitigation-actions\/#12_Stakeholder_resistance_slows_adoption\" >12. Stakeholder resistance slows adoption<\/a><\/li><\/ul><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-17\" href=\"https:\/\/www.epw.com\/blog\/project-management-articles\/project-risk-examples-mitigation-actions\/#Transition_and_external_risks\" >Transition and external risks<\/a><ul class='ez-toc-list-level-3' ><li class='ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-18\" href=\"https:\/\/www.epw.com\/blog\/project-management-articles\/project-risk-examples-mitigation-actions\/#13_A_safety_or_regulatory_requirement_changes\" >13. A safety or regulatory requirement changes<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-19\" href=\"https:\/\/www.epw.com\/blog\/project-management-articles\/project-risk-examples-mitigation-actions\/#14_Operational_handover_is_rejected\" >14. Operational handover is rejected<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-20\" href=\"https:\/\/www.epw.com\/blog\/project-management-articles\/project-risk-examples-mitigation-actions\/#15_External_disruption_affects_delivery\" >15. External disruption affects delivery<\/a><\/li><\/ul><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-21\" href=\"https:\/\/www.epw.com\/blog\/project-management-articles\/project-risk-examples-mitigation-actions\/#Use_the_EPW_ACTION_response_test\" >Use the EPW ACTION response test<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-22\" href=\"https:\/\/www.epw.com\/blog\/project-management-articles\/project-risk-examples-mitigation-actions\/#How_to_use_these_examples_in_a_risk_workshop\" >How to use these examples in a risk workshop<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-23\" href=\"https:\/\/www.epw.com\/blog\/project-management-articles\/project-risk-examples-mitigation-actions\/#Turn_examples_into_decisions\" >Turn examples into decisions<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-24\" href=\"https:\/\/www.epw.com\/blog\/project-management-articles\/project-risk-examples-mitigation-actions\/#Sources_and_References\" >Sources and References<\/a><\/li><\/ul><\/nav><\/div>\n<h2 id=\"examples-at-a-glance\"><span class=\"ez-toc-section\" id=\"15_project_risk_examples_at_a_glance\"><\/span>15 project risk examples at a glance<span class=\"ez-toc-section-end\"><\/span><\/h2>\n<table>\n<thead>\n<tr>\n<th scope=\"col\">#<\/th>\n<th scope=\"col\">Risk event<\/th>\n<th scope=\"col\">Early warning<\/th>\n<th scope=\"col\">Primary mitigation direction<\/th>\n<\/tr>\n<\/thead>\n<tbody>\n<tr>\n<td>1<\/td>\n<td>Strategic priorities change<\/td>\n<td>Sponsor decisions are repeatedly deferred<\/td>\n<td>Confirm decision gates and strategic alignment<\/td>\n<\/tr>\n<tr>\n<td>2<\/td>\n<td>Approval arrives late<\/td>\n<td>Review comments remain unresolved<\/td>\n<td>Plan evidence, reviewers and deadlines<\/td>\n<\/tr>\n<tr>\n<td>3<\/td>\n<td>Estimate is materially inaccurate<\/td>\n<td>Assumptions lack evidence<\/td>\n<td>Use ranges, reference data and review<\/td>\n<\/tr>\n<tr>\n<td>4<\/td>\n<td>Requirements continue to change<\/td>\n<td>Acceptance criteria are unstable<\/td>\n<td>Prioritise, trace and control change<\/td>\n<\/tr>\n<tr>\n<td>5<\/td>\n<td>Critical dependency is late<\/td>\n<td>External milestone has no confirmed owner<\/td>\n<td>Integrate schedules and agree triggers<\/td>\n<\/tr>\n<tr>\n<td>6<\/td>\n<td>Technical integration fails<\/td>\n<td>Interfaces are untested<\/td>\n<td>Define interfaces and test early<\/td>\n<\/tr>\n<tr>\n<td>7<\/td>\n<td>Quality defects require rework<\/td>\n<td>First-pass acceptance declines<\/td>\n<td>Strengthen prevention and staged control<\/td>\n<\/tr>\n<tr>\n<td>8<\/td>\n<td>Data migration is incomplete<\/td>\n<td>Reconciliation differences persist<\/td>\n<td>Profile, cleanse, rehearse and reconcile<\/td>\n<\/tr>\n<tr>\n<td>9<\/td>\n<td>Supplier performance deteriorates<\/td>\n<td>Milestones and submittals slip<\/td>\n<td>Set measures, recovery routes and alternatives<\/td>\n<\/tr>\n<tr>\n<td>10<\/td>\n<td>Price or currency movement raises cost<\/td>\n<td>Exposure exceeds an agreed threshold<\/td>\n<td>Allocate, hedge or hold contingency appropriately<\/td>\n<\/tr>\n<tr>\n<td>11<\/td>\n<td>Specialist capacity is unavailable<\/td>\n<td>Overallocation or turnover increases<\/td>\n<td>Secure capacity and cross-train<\/td>\n<\/tr>\n<tr>\n<td>12<\/td>\n<td>Stakeholder resistance slows adoption<\/td>\n<td>Participation and readiness remain low<\/td>\n<td>Engage by impact and prepare users<\/td>\n<\/tr>\n<tr>\n<td>13<\/td>\n<td>Safety or regulatory requirement changes<\/td>\n<td>New guidance or review comments emerge<\/td>\n<td>Monitor obligations and preserve evidence<\/td>\n<\/tr>\n<tr>\n<td>14<\/td>\n<td>Operational handover is rejected<\/td>\n<td>Readiness evidence is incomplete<\/td>\n<td>Agree acceptance and rehearse transition<\/td>\n<\/tr>\n<tr>\n<td>15<\/td>\n<td>External disruption affects delivery<\/td>\n<td>Lead times or access conditions worsen<\/td>\n<td>Develop scenarios and continuity options<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<figure class=\"wp-block-image size-full\"><img loading=\"lazy\" decoding=\"async\" width=\"1200\" height=\"900\" src=\"https:\/\/assets.epw.com\/blog\/wp-content\/uploads\/2026\/09\/10061941\/project-risk-example-groups.webp\" alt=\"Matrix grouping 15 project risks by source and affected objective\" class=\"wp-image-2784\" style=\"max-width:100%;height:auto\" srcset=\"https:\/\/assets.epw.com\/blog\/wp-content\/uploads\/2026\/09\/10061941\/project-risk-example-groups.webp 1200w, https:\/\/assets.epw.com\/blog\/wp-content\/uploads\/2026\/09\/10061941\/project-risk-example-groups-300x225.webp 300w, https:\/\/assets.epw.com\/blog\/wp-content\/uploads\/2026\/09\/10061941\/project-risk-example-groups-1024x768.webp 1024w, https:\/\/assets.epw.com\/blog\/wp-content\/uploads\/2026\/09\/10061941\/project-risk-example-groups-768x576.webp 768w\" sizes=\"auto, (max-width: 1200px) 100vw, 1200px\" \/><figcaption>Grouping risks by source and affected objective helps teams identify gaps in a risk register.<\/figcaption><\/figure>\n<h2 id=\"governance-planning\"><span class=\"ez-toc-section\" id=\"Governance_and_planning_risks\"><\/span>Governance and planning risks<span class=\"ez-toc-section-end\"><\/span><\/h2>\n<h3><span class=\"ez-toc-section\" id=\"1_Strategic_priorities_change\"><\/span>1. Strategic priorities change<span class=\"ez-toc-section-end\"><\/span><\/h3>\n<p><strong>Example:<\/strong> If organisational priorities change before the next funding decision, the project may lose sponsorship or investment, delaying or stopping delivery. <strong>Mitigation:<\/strong> agree strategic decision gates, maintain a current benefits case and define which assumptions would trigger re-evaluation. <strong>Contingency:<\/strong> prepare options to pause, reduce or resequence scope rather than continuing by inertia.<\/p>\n<h3><span class=\"ez-toc-section\" id=\"2_A_critical_approval_arrives_late\"><\/span>2. A critical approval arrives late<span class=\"ez-toc-section-end\"><\/span><\/h3>\n<p><strong>Example:<\/strong> If design, legal or investment approval is not received by the required date, dependent work may start late. <strong>Mitigation:<\/strong> identify approvers early, agree evidence requirements, schedule pre-reviews and track unresolved comments. <strong>Trigger:<\/strong> escalate when the forecast approval date reaches the schedule&#8217;s available tolerance.<\/p>\n<h3><span class=\"ez-toc-section\" id=\"3_The_estimate_is_materially_inaccurate\"><\/span>3. The estimate is materially inaccurate<span class=\"ez-toc-section-end\"><\/span><\/h3>\n<p><strong>Example:<\/strong> If quantities, rates or productivity assumptions are unreliable, the approved budget or completion date may be unrealistic. <strong>Mitigation:<\/strong> document assumptions, use reference-class information where available, express uncertainty as ranges and require independent challenge for material estimates. EPW&#8217;s <a href=\"https:\/\/www.epw.com\/training\/advanced-project-planning-and-control-techniques\">Advanced Project Planning and Control Techniques<\/a> course is relevant where estimating, baselines and control need to work as one system.<\/p>\n<h2 id=\"delivery-technical\"><span class=\"ez-toc-section\" id=\"Delivery_and_technical_risks\"><\/span>Delivery and technical risks<span class=\"ez-toc-section-end\"><\/span><\/h2>\n<h3><span class=\"ez-toc-section\" id=\"4_Requirements_continue_to_change\"><\/span>4. Requirements continue to change<span class=\"ez-toc-section-end\"><\/span><\/h3>\n<p><strong>Example:<\/strong> If users cannot stabilise priority requirements, the team may redesign work and miss acceptance dates. <strong>Mitigation:<\/strong> make requirements testable, trace them to objectives, prioritise them and apply change control to the approved baseline. The Association for Project Management defines change control as capturing, evaluating and then approving, rejecting or deferring requests to alter a baseline. <a href=\"https:\/\/www.apm.org.uk\/resources\/what-is-project-management\/what-is-change-control\/\">APM change-control guidance<\/a>.<\/p>\n<h3><span class=\"ez-toc-section\" id=\"5_A_critical_dependency_is_late\"><\/span>5. A critical dependency is late<span class=\"ez-toc-section-end\"><\/span><\/h3>\n<p><strong>Example:<\/strong> If an enabling project, permit or client-supplied item is late, the delivery sequence may fail. <strong>Mitigation:<\/strong> place dependencies in the integrated schedule, assign owners on both sides and agree evidence-based status dates. <strong>Contingency:<\/strong> identify work that can be safely resequenced before the trigger is reached.<\/p>\n<h3><span class=\"ez-toc-section\" id=\"6_Technical_integration_fails\"><\/span>6. Technical integration fails<span class=\"ez-toc-section-end\"><\/span><\/h3>\n<p><strong>Example:<\/strong> If interfaces between systems, packages or disciplines are incomplete, components may work separately but fail together. <strong>Mitigation:<\/strong> define interface ownership, freeze critical specifications progressively, use prototypes and test the highest-risk interfaces early.<\/p>\n<h3><span class=\"ez-toc-section\" id=\"7_Quality_defects_create_rework\"><\/span>7. Quality defects create rework<span class=\"ez-toc-section-end\"><\/span><\/h3>\n<p><strong>Example:<\/strong> If preventive controls are weak or acceptance criteria are ambiguous, outputs may fail inspection and require costly rework. <strong>Mitigation:<\/strong> define acceptance evidence, review capability, inspect at points where correction remains practical and analyse recurring causes rather than only repairing each defect.<\/p>\n<h3><span class=\"ez-toc-section\" id=\"8_Data_migration_is_incomplete_or_inaccurate\"><\/span>8. Data migration is incomplete or inaccurate<span class=\"ez-toc-section-end\"><\/span><\/h3>\n<p><strong>Example:<\/strong> If source data is poor or transformation rules are incorrect, the new solution may produce unreliable records at launch. <strong>Mitigation:<\/strong> profile and cleanse data, define reconciliation rules, rehearse migration using representative volumes and require accountable sign-off.<\/p>\n<h2 id=\"commercial-people\"><span class=\"ez-toc-section\" id=\"Commercial_and_people_risks\"><\/span>Commercial and people risks<span class=\"ez-toc-section-end\"><\/span><\/h2>\n<h3><span class=\"ez-toc-section\" id=\"9_Supplier_performance_deteriorates\"><\/span>9. Supplier performance deteriorates<span class=\"ez-toc-section-end\"><\/span><\/h3>\n<p><strong>Example:<\/strong> If a supplier misses submittals or production milestones, dependent project work may be delayed. <strong>Mitigation:<\/strong> use measurable obligations, inspect leading indicators, hold structured recovery reviews and maintain proportionate alternatives for critical supply. EPW&#8217;s <a href=\"https:\/\/www.epw.com\/training\/project-procurement-and-vendor-coordination\">Project Procurement and Vendor Coordination<\/a> course provides a related capability route.<\/p>\n<h3><span class=\"ez-toc-section\" id=\"10_Price_or_currency_movement_increases_cost\"><\/span>10. Price or currency movement increases cost<span class=\"ez-toc-section-end\"><\/span><\/h3>\n<p><strong>Example:<\/strong> If an exposed commodity or currency moves beyond the estimating assumption, the project may exceed its approved budget. <strong>Mitigation:<\/strong> quantify the exposure, allocate it clearly in contracts, consider approved financial or purchasing responses and set thresholds for drawing contingency. Specialist financial advice may be required; a project team should not improvise hedging.<\/p>\n<h3><span class=\"ez-toc-section\" id=\"11_Specialist_capacity_is_unavailable\"><\/span>11. Specialist capacity is unavailable<span class=\"ez-toc-section-end\"><\/span><\/h3>\n<p><strong>Example:<\/strong> If a scarce expert is diverted or leaves, critical design, review or commissioning work may stop. <strong>Mitigation:<\/strong> confirm named capacity, cross-train suitable colleagues, document critical decisions and plan succession for single-person dependencies.<\/p>\n<h3><span class=\"ez-toc-section\" id=\"12_Stakeholder_resistance_slows_adoption\"><\/span>12. Stakeholder resistance slows adoption<span class=\"ez-toc-section-end\"><\/span><\/h3>\n<p><strong>Example:<\/strong> If affected users do not understand or accept the new process, technically complete outputs may not produce intended benefits. <strong>Mitigation:<\/strong> assess impacts by stakeholder group, involve credible operational representatives, address concerns, prepare role-specific support and measure actual use. For deeper stakeholder practice, see EPW&#8217;s <a href=\"https:\/\/www.epw.com\/training\/project-leadership-and-stakeholder-engagement\">Project Leadership and Stakeholder Engagement<\/a> course.<\/p>\n<h2 id=\"transition-external\"><span class=\"ez-toc-section\" id=\"Transition_and_external_risks\"><\/span>Transition and external risks<span class=\"ez-toc-section-end\"><\/span><\/h2>\n<h3><span class=\"ez-toc-section\" id=\"13_A_safety_or_regulatory_requirement_changes\"><\/span>13. A safety or regulatory requirement changes<span class=\"ez-toc-section-end\"><\/span><\/h3>\n<p><strong>Example:<\/strong> If a relevant obligation or approval interpretation changes during delivery, completed work may need redesign or further evidence. <strong>Mitigation:<\/strong> assign regulatory ownership, monitor authoritative notices, maintain traceability and involve competent reviewers before irreversible decisions.<\/p>\n<h3><span class=\"ez-toc-section\" id=\"14_Operational_handover_is_rejected\"><\/span>14. Operational handover is rejected<span class=\"ez-toc-section-end\"><\/span><\/h3>\n<p><strong>Example:<\/strong> If training, support, asset information or acceptance evidence is incomplete, operations may refuse handover. <strong>Mitigation:<\/strong> define readiness criteria with operational owners, plan transition activities as delivery work and rehearse critical cutover and recovery procedures. EPW&#8217;s <a href=\"https:\/\/www.epw.com\/training\/monitoring-evaluation-and-project-closure-excellence\">Monitoring Evaluation and Project Closure Excellence<\/a> course supports related closure and evaluation capability.<\/p>\n<h3><span class=\"ez-toc-section\" id=\"15_External_disruption_affects_delivery\"><\/span>15. External disruption affects delivery<span class=\"ez-toc-section-end\"><\/span><\/h3>\n<p><strong>Example:<\/strong> If severe weather, infrastructure failure, civil restriction or another external event affects access or supply, milestones may be missed. <strong>Mitigation:<\/strong> develop plausible scenarios, identify critical resources and lead times, maintain continuity options and monitor indicators tied to decisions. Avoid vague labels such as \u201cforce majeure risk\u201d; describe the event and the affected objective.<\/p>\n<h2 id=\"action-test\"><span class=\"ez-toc-section\" id=\"Use_the_EPW_ACTION_response_test\"><\/span>Use the EPW ACTION response test<span class=\"ez-toc-section-end\"><\/span><\/h2>\n<p>For each material project risk, test the response with six questions:<\/p>\n<ol>\n<li><strong>A \u2014 Aim:<\/strong> Which objective is exposed?<\/li>\n<li><strong>C \u2014 Cause and condition:<\/strong> What uncertainty could produce the event?<\/li>\n<li><strong>T \u2014 Treatment:<\/strong> How will the action change likelihood, impact or exposure?<\/li>\n<li><strong>I \u2014 Indicator:<\/strong> Which measurable signal shows the risk is changing?<\/li>\n<li><strong>O \u2014 Owner:<\/strong> Who has authority and capacity to manage the response?<\/li>\n<li><strong>N \u2014 Next decision:<\/strong> What contingency or escalation follows the trigger?<\/li>\n<\/ol>\n<p>This original EPW test prevents \u201cmonitor closely\u201d from passing as a mitigation. A valid response has a mechanism, owner, evidence and decision point. The UK Government&#8217;s Orange Book likewise states that risk management should be integral to informed decision-making from project inception through implementation and service delivery. <a href=\"https:\/\/www.gov.uk\/government\/publications\/orange-book\/the-orange-book-management-of-risk-principles-and-concepts\">The Orange Book: Management of Risk<\/a>.<\/p>\n<figure class=\"wp-block-image size-full\"><img loading=\"lazy\" decoding=\"async\" width=\"1200\" height=\"900\" src=\"https:\/\/assets.epw.com\/blog\/wp-content\/uploads\/2026\/09\/10062242\/epw-action-risk-response-test.webp\" alt=\"EPW ACTION test linking a project risk to treatment, indicators, ownership and decisions\" class=\"wp-image-2785\" style=\"max-width:100%;height:auto\" srcset=\"https:\/\/assets.epw.com\/blog\/wp-content\/uploads\/2026\/09\/10062242\/epw-action-risk-response-test.webp 1200w, https:\/\/assets.epw.com\/blog\/wp-content\/uploads\/2026\/09\/10062242\/epw-action-risk-response-test-300x225.webp 300w, https:\/\/assets.epw.com\/blog\/wp-content\/uploads\/2026\/09\/10062242\/epw-action-risk-response-test-1024x768.webp 1024w, https:\/\/assets.epw.com\/blog\/wp-content\/uploads\/2026\/09\/10062242\/epw-action-risk-response-test-768x576.webp 768w\" sizes=\"auto, (max-width: 1200px) 100vw, 1200px\" \/><figcaption>The EPW ACTION test turns a risk statement into an accountable response and trigger.<\/figcaption><\/figure>\n<p>Professionals who want to practise identification, analysis, mitigation and monitoring can explore EPW&#8217;s <a href=\"https:\/\/www.epw.com\/training\/project-risk-management-and-mitigation-strategies\">Project Risk Management and Mitigation Strategies<\/a> course.<\/p>\n<h2 id=\"use-the-list\"><span class=\"ez-toc-section\" id=\"How_to_use_these_examples_in_a_risk_workshop\"><\/span>How to use these examples in a risk workshop<span class=\"ez-toc-section-end\"><\/span><\/h2>\n<ol>\n<li>Start with the project&#8217;s objectives, assumptions, interfaces and decisions.<\/li>\n<li>Use the 15 examples only as prompts; rewrite each relevant risk for the actual context.<\/li>\n<li>Record causes, event, effects, existing controls and current exposure separately.<\/li>\n<li>Prioritise using the organisation&#8217;s approved method and risk appetite.<\/li>\n<li>Assign actions that change exposure, plus dates, resources and owners.<\/li>\n<li>Define indicators and contingency triggers before the event occurs.<\/li>\n<li>Review residual and secondary risks after responses are planned.<\/li>\n<\/ol>\n<p>The Government Project Delivery Teal Book advises beginning with the sponsoring organisation&#8217;s risk appetite, policies and procedures, then applying identification, assessment, response, monitoring and reporting in context. <a href=\"https:\/\/projectdelivery.gov.uk\/teal-book\/home\/part-e-planning-and-control\/chapter-20-risk-management\/\">The Teal Book, Chapter 20: Risk Management<\/a>. Teams needing the broader foundation can also review EPW&#8217;s <a href=\"https:\/\/www.epw.com\/training\/project-management-fundamentals-and-best-practices\">Project Management Fundamentals and Best Practices<\/a> course.<\/p>\n<h2 id=\"conclusion\"><span class=\"ez-toc-section\" id=\"Turn_examples_into_decisions\"><\/span>Turn examples into decisions<span class=\"ez-toc-section-end\"><\/span><\/h2>\n<p>A strong risk register is specific to the project, current enough to influence action and proportionate to the decisions at stake. Use these project risk examples to widen identification, then replace generic wording with real causes, events, objectives, owners, mitigations and triggers.<\/p>\n<p>Browse the full <a href=\"https:\/\/www.epw.com\/courses\/project-management-training\">Project Management Training Courses<\/a> category for connected development options.<\/p>\n<p><strong>Ready to strengthen project risk identification and response planning?<\/strong> Explore EPW&#8217;s <a href=\"https:\/\/www.epw.com\/training\/project-risk-management-and-mitigation-strategies\">Project Risk Management and Mitigation Strategies<\/a> course, review the available options or enquire about tailored in-house training.<\/p>\n<h2 id=\"sources\"><span class=\"ez-toc-section\" id=\"Sources_and_References\"><\/span>Sources and References<span class=\"ez-toc-section-end\"><\/span><\/h2>\n<ol>\n<li>International Organization for Standardization. <a href=\"https:\/\/www.iso.org\/standard\/65694.html\"><em>ISO 31000:2018 \u2014 Risk Management: Guidelines<\/em><\/a>.<\/li>\n<li>HM Government. <a href=\"https:\/\/www.gov.uk\/government\/publications\/orange-book\/the-orange-book-management-of-risk-principles-and-concepts\"><em>The Orange Book: Management of Risk \u2014 Principles and Concepts<\/em><\/a>. Updated 29 July 2026.<\/li>\n<li>Government Project Delivery. <a href=\"https:\/\/projectdelivery.gov.uk\/teal-book\/home\/part-e-planning-and-control\/chapter-20-risk-management\/\"><em>The Teal Book, Chapter 20: Risk Management<\/em><\/a>.<\/li>\n<li>Project Management Institute. <a href=\"https:\/\/www.pmi.org\/standards\/risk-management\"><em>Risk Management in Portfolios, Programs, and Projects: A Practice Guide<\/em><\/a>.<\/li>\n<li>Association for Project Management. <a href=\"https:\/\/www.apm.org.uk\/resources\/what-is-project-management\/what-is-change-control\/\"><em>What Is Change Control?<\/em><\/a>.<\/li>\n<\/ol>\n","protected":false},"excerpt":{"rendered":"<p>AI-generated illustration created to represent the article\u2019s subject. It does not depict an actual EPW course, trainer, participant, client, event or venue. Useful project risk examples describe an uncertain event, its cause and its effect on an objective. Common examples include late approvals, inaccurate estimates, resource conflicts, supplier failure, requirements volatility, integration defects and weak&#8230;<\/p>\n","protected":false},"author":1,"featured_media":2935,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[29],"tags":[33,19,16],"class_list":["post-2405","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-project-management-articles","tag-project-management","tag-risk-assessment","tag-risk-management"],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v25.7 - https:\/\/yoast.com\/wordpress\/plugins\/seo\/ -->\n<title>15 Project Risk Examples and Effective Mitigation Actions<\/title>\n<meta name=\"description\" content=\"Review 15 practical project risk examples with warning signs, mitigation actions, contingency triggers and ownership guidance for stronger delivery decisions.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.epw.com\/blog\/project-management-articles\/project-risk-examples-mitigation-actions\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"15 Project Risk Examples and Effective Mitigation Actions\" \/>\n<meta property=\"og:description\" content=\"Review 15 practical project risk examples with warning signs, mitigation actions, contingency triggers and ownership guidance for stronger delivery decisions.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.epw.com\/blog\/project-management-articles\/project-risk-examples-mitigation-actions\" \/>\n<meta property=\"og:site_name\" content=\"Blog Categories - EPW Training\" \/>\n<meta property=\"article:published_time\" content=\"2026-09-10T06:27:50+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2026-09-13T08:25:57+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/assets.epw.com\/blog\/wp-content\/uploads\/2026\/09\/13081937\/project-risk-examples-mitigation-actions-featured.webp\" \/>\n\t<meta property=\"og:image:width\" content=\"1024\" \/>\n\t<meta property=\"og:image:height\" content=\"576\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/webp\" \/>\n<meta name=\"author\" content=\"EPW Training Blog\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"EPW Training Blog\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"8 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":[\"Article\",\"BlogPosting\"],\"@id\":\"https:\/\/www.epw.com\/blog\/project-management-articles\/project-risk-examples-mitigation-actions#article\",\"isPartOf\":{\"@id\":\"https:\/\/www.epw.com\/blog\/project-management-articles\/project-risk-examples-mitigation-actions\"},\"author\":{\"@type\":\"Organization\",\"name\":\"EPW Training Blog\",\"url\":\"https:\/\/www.epw.com\/blog\/\",\"@id\":\"https:\/\/www.epw.com\/blog\/#organization\"},\"headline\":\"15 Project Risk Examples and Effective Mitigation Actions\",\"datePublished\":\"2026-09-10T06:27:50+00:00\",\"dateModified\":\"2026-09-13T08:25:57+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\/\/www.epw.com\/blog\/project-management-articles\/project-risk-examples-mitigation-actions\"},\"wordCount\":1625,\"publisher\":{\"@id\":\"https:\/\/www.epw.com\/blog\/#organization\"},\"image\":{\"@id\":\"https:\/\/www.epw.com\/blog\/project-management-articles\/project-risk-examples-mitigation-actions#primaryimage\"},\"thumbnailUrl\":\"https:\/\/assets.epw.com\/blog\/wp-content\/uploads\/2026\/09\/13081937\/project-risk-examples-mitigation-actions-featured.webp\",\"keywords\":[\"project management\",\"Risk Assessment\",\"Risk Management\"],\"articleSection\":[\"Project Management Articles\"],\"inLanguage\":\"en-US\"},{\"@type\":\"WebPage\",\"@id\":\"https:\/\/www.epw.com\/blog\/project-management-articles\/project-risk-examples-mitigation-actions\",\"url\":\"https:\/\/www.epw.com\/blog\/project-management-articles\/project-risk-examples-mitigation-actions\",\"name\":\"15 Project Risk Examples and Effective Mitigation Actions\",\"isPartOf\":{\"@id\":\"https:\/\/www.epw.com\/blog\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\/\/www.epw.com\/blog\/project-management-articles\/project-risk-examples-mitigation-actions#primaryimage\"},\"image\":{\"@id\":\"https:\/\/www.epw.com\/blog\/project-management-articles\/project-risk-examples-mitigation-actions#primaryimage\"},\"thumbnailUrl\":\"https:\/\/assets.epw.com\/blog\/wp-content\/uploads\/2026\/09\/13081937\/project-risk-examples-mitigation-actions-featured.webp\",\"datePublished\":\"2026-09-10T06:27:50+00:00\",\"dateModified\":\"2026-09-13T08:25:57+00:00\",\"description\":\"Review 15 practical project risk examples with warning signs, mitigation actions, contingency triggers and ownership guidance for stronger delivery decisions.\",\"breadcrumb\":{\"@id\":\"https:\/\/www.epw.com\/blog\/project-management-articles\/project-risk-examples-mitigation-actions#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/www.epw.com\/blog\/project-management-articles\/project-risk-examples-mitigation-actions\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/www.epw.com\/blog\/project-management-articles\/project-risk-examples-mitigation-actions#primaryimage\",\"url\":\"https:\/\/assets.epw.com\/blog\/wp-content\/uploads\/2026\/09\/13081937\/project-risk-examples-mitigation-actions-featured.webp\",\"contentUrl\":\"https:\/\/assets.epw.com\/blog\/wp-content\/uploads\/2026\/09\/13081937\/project-risk-examples-mitigation-actions-featured.webp\",\"width\":1024,\"height\":576,\"caption\":\"Project team reviewing risk examples and mitigation actions in a meeting room\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/www.epw.com\/blog\/project-management-articles\/project-risk-examples-mitigation-actions#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\/\/www.epw.com\/blog\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"15 Project Risk Examples and Effective Mitigation Actions\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/www.epw.com\/blog\/#website\",\"url\":\"https:\/\/www.epw.com\/blog\/\",\"name\":\"Blog Categories - EPW Training\",\"description\":\"Expert Insights and Updates in Professional Training\",\"publisher\":{\"@id\":\"https:\/\/www.epw.com\/blog\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/www.epw.com\/blog\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\/\/www.epw.com\/blog\/#organization\",\"name\":\"Blog Categories - EPW Training\",\"url\":\"https:\/\/www.epw.com\/blog\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/www.epw.com\/blog\/#\/schema\/logo\/image\/\",\"url\":\"https:\/\/www.epw.com\/blog\/wp-content\/uploads\/2025\/08\/epw-training-blog-logo.png\",\"contentUrl\":\"https:\/\/www.epw.com\/blog\/wp-content\/uploads\/2025\/08\/epw-training-blog-logo.png\",\"width\":746,\"height\":256,\"caption\":\"Blog Categories - EPW Training\"},\"image\":{\"@id\":\"https:\/\/www.epw.com\/blog\/#\/schema\/logo\/image\/\"}},{\"@type\":\"Person\",\"@id\":\"https:\/\/www.epw.com\/blog\/#person\",\"name\":\"EPW Training Blog\",\"sameAs\":[\"https:\/\/www.epw.com\/blog\/\"],\"url\":\"https:\/\/www.epw.com\/blog\/\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"15 Project Risk Examples and Effective Mitigation Actions","description":"Review 15 practical project risk examples with warning signs, mitigation actions, contingency triggers and ownership guidance for stronger delivery decisions.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.epw.com\/blog\/project-management-articles\/project-risk-examples-mitigation-actions","og_locale":"en_US","og_type":"article","og_title":"15 Project Risk Examples and Effective Mitigation Actions","og_description":"Review 15 practical project risk examples with warning signs, mitigation actions, contingency triggers and ownership guidance for stronger delivery decisions.","og_url":"https:\/\/www.epw.com\/blog\/project-management-articles\/project-risk-examples-mitigation-actions","og_site_name":"Blog Categories - EPW Training","article_published_time":"2026-09-10T06:27:50+00:00","article_modified_time":"2026-09-13T08:25:57+00:00","og_image":[{"width":1024,"height":576,"url":"https:\/\/assets.epw.com\/blog\/wp-content\/uploads\/2026\/09\/13081937\/project-risk-examples-mitigation-actions-featured.webp","type":"image\/webp"}],"author":"EPW Training Blog","twitter_card":"summary_large_image","twitter_misc":{"Written by":"EPW Training Blog","Est. reading time":"8 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":["Article","BlogPosting"],"@id":"https:\/\/www.epw.com\/blog\/project-management-articles\/project-risk-examples-mitigation-actions#article","isPartOf":{"@id":"https:\/\/www.epw.com\/blog\/project-management-articles\/project-risk-examples-mitigation-actions"},"author":{"@type":"Organization","name":"EPW Training Blog","url":"https:\/\/www.epw.com\/blog\/","@id":"https:\/\/www.epw.com\/blog\/#organization"},"headline":"15 Project Risk Examples and Effective Mitigation Actions","datePublished":"2026-09-10T06:27:50+00:00","dateModified":"2026-09-13T08:25:57+00:00","mainEntityOfPage":{"@id":"https:\/\/www.epw.com\/blog\/project-management-articles\/project-risk-examples-mitigation-actions"},"wordCount":1625,"publisher":{"@id":"https:\/\/www.epw.com\/blog\/#organization"},"image":{"@id":"https:\/\/www.epw.com\/blog\/project-management-articles\/project-risk-examples-mitigation-actions#primaryimage"},"thumbnailUrl":"https:\/\/assets.epw.com\/blog\/wp-content\/uploads\/2026\/09\/13081937\/project-risk-examples-mitigation-actions-featured.webp","keywords":["project management","Risk Assessment","Risk Management"],"articleSection":["Project Management Articles"],"inLanguage":"en-US"},{"@type":"WebPage","@id":"https:\/\/www.epw.com\/blog\/project-management-articles\/project-risk-examples-mitigation-actions","url":"https:\/\/www.epw.com\/blog\/project-management-articles\/project-risk-examples-mitigation-actions","name":"15 Project Risk Examples and Effective Mitigation Actions","isPartOf":{"@id":"https:\/\/www.epw.com\/blog\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.epw.com\/blog\/project-management-articles\/project-risk-examples-mitigation-actions#primaryimage"},"image":{"@id":"https:\/\/www.epw.com\/blog\/project-management-articles\/project-risk-examples-mitigation-actions#primaryimage"},"thumbnailUrl":"https:\/\/assets.epw.com\/blog\/wp-content\/uploads\/2026\/09\/13081937\/project-risk-examples-mitigation-actions-featured.webp","datePublished":"2026-09-10T06:27:50+00:00","dateModified":"2026-09-13T08:25:57+00:00","description":"Review 15 practical project risk examples with warning signs, mitigation actions, contingency triggers and ownership guidance for stronger delivery decisions.","breadcrumb":{"@id":"https:\/\/www.epw.com\/blog\/project-management-articles\/project-risk-examples-mitigation-actions#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.epw.com\/blog\/project-management-articles\/project-risk-examples-mitigation-actions"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.epw.com\/blog\/project-management-articles\/project-risk-examples-mitigation-actions#primaryimage","url":"https:\/\/assets.epw.com\/blog\/wp-content\/uploads\/2026\/09\/13081937\/project-risk-examples-mitigation-actions-featured.webp","contentUrl":"https:\/\/assets.epw.com\/blog\/wp-content\/uploads\/2026\/09\/13081937\/project-risk-examples-mitigation-actions-featured.webp","width":1024,"height":576,"caption":"Project team reviewing risk examples and mitigation actions in a meeting room"},{"@type":"BreadcrumbList","@id":"https:\/\/www.epw.com\/blog\/project-management-articles\/project-risk-examples-mitigation-actions#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.epw.com\/blog"},{"@type":"ListItem","position":2,"name":"15 Project Risk Examples and Effective Mitigation Actions"}]},{"@type":"WebSite","@id":"https:\/\/www.epw.com\/blog\/#website","url":"https:\/\/www.epw.com\/blog\/","name":"Blog Categories - EPW Training","description":"Expert Insights and Updates in Professional Training","publisher":{"@id":"https:\/\/www.epw.com\/blog\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.epw.com\/blog\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/www.epw.com\/blog\/#organization","name":"Blog Categories - EPW Training","url":"https:\/\/www.epw.com\/blog\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.epw.com\/blog\/#\/schema\/logo\/image\/","url":"https:\/\/www.epw.com\/blog\/wp-content\/uploads\/2025\/08\/epw-training-blog-logo.png","contentUrl":"https:\/\/www.epw.com\/blog\/wp-content\/uploads\/2025\/08\/epw-training-blog-logo.png","width":746,"height":256,"caption":"Blog Categories - EPW Training"},"image":{"@id":"https:\/\/www.epw.com\/blog\/#\/schema\/logo\/image\/"}},{"@type":"Person","@id":"https:\/\/www.epw.com\/blog\/#person","name":"EPW Training Blog","sameAs":["https:\/\/www.epw.com\/blog\/"],"url":"https:\/\/www.epw.com\/blog\/"}]}},"_links":{"self":[{"href":"https:\/\/www.epw.com\/blog\/wp-json\/wp\/v2\/posts\/2405","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.epw.com\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.epw.com\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.epw.com\/blog\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.epw.com\/blog\/wp-json\/wp\/v2\/comments?post=2405"}],"version-history":[{"count":3,"href":"https:\/\/www.epw.com\/blog\/wp-json\/wp\/v2\/posts\/2405\/revisions"}],"predecessor-version":[{"id":2938,"href":"https:\/\/www.epw.com\/blog\/wp-json\/wp\/v2\/posts\/2405\/revisions\/2938"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.epw.com\/blog\/wp-json\/wp\/v2\/media\/2935"}],"wp:attachment":[{"href":"https:\/\/www.epw.com\/blog\/wp-json\/wp\/v2\/media?parent=2405"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.epw.com\/blog\/wp-json\/wp\/v2\/categories?post=2405"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.epw.com\/blog\/wp-json\/wp\/v2\/tags?post=2405"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}